UGL Pty Ltd have been systematically remediating piles over the pipeline since mid-2019. Piles have been remediated using Pilemedic by Quakewrap – with a mixture of structural and durability.
Scope includes concrete breakout, cleaning, airlifting, spacer installation, FRP rod installation (as required) and product installation.
200+ piles remediated
Manage this project simultaneously with other projects, with up to four (4) Dive Teams in operation at any one time.
Provision of plant such as dive equipment, vessels, barges and pontoons