Projects

More Projects & Case Studies

Underwater Inspection & Hydrus AUV 3D Mapping | CMG Great Keppel Island

Middle Island Underwater Observatory Inspection Client: DEMEXDate: September 2025 Commercial Marine Group was engaged by

20253D ScanningDEMEXHydrus AUVProjectsUnderwater Inspections
Port North Common User Berth Deconstruction and Removal Works

Client: Brady Marine and Civil | Port of Brisbane Commercial Marine Group was engaged by

Brady Marine & CivilBrisbane PortDecommissioningProjects

Download Our Capability Statements

BBC Rowing Club Pontoon – Beam Replacement

BBCMarine Civil ConstructionProjects

Client: Brisbane Boys’ College

Brisbane Boys’ College has engaged Commercial Marine Group (CMG), leveraging their marine expertise and proven track record, to provide dive support and undertake the replacement of a pontoon beam at the school’s Rowing Club located in St Lucia. CMG previously completed similar works at this site in 2022.

Scope of Works

This project involves a full removal and like-for-like replacement of the existing pontoon beam, including associated timber decking. The detailed scope includes:

  • Site Inspection & Measurements:
    A comprehensive on-site inspection to assess the condition of the existing structure and collect precise measurements for the fabrication of a new beam.
  • Beam Fabrication:
    Manufacture of a new beam, designed as three (3) sections to be spliced at locations experiencing lower structural loads and stresses, ensuring both strength and ease of installation.
  • Removal of Existing Beam:
    Safe removal of the current beam (comprised of two spliced sections) utilizing the on-deck HIAB crane aboard CMG’s vessel Invictus. If necessary, temporary support will be provided to the pontoons and gangway during this phase.
  • Installation of New Beam:
    Installation of the newly fabricated beam (three sections) using the HIAB crane aboard Invictus, ensuring accurate alignment and secure placement.
  • Anchoring and Reconnection:
    Installation of new ChemSet anchor bolts into the concrete deck of the pontoons. Reinstatement of the four (4) gangway hinges to ensure structural integrity and functionality.
  • Decking Replacement:
    Replacement of the timber decking located above the beam with new like-for-like (or equivalent) decking materials to match the original aesthetic and performance.

Project Gallery

Let's Build
Together