Decommissioning
Afloat wharf demolition, pile extraction, and subsea line isolation. Safely managing environmental footprints under strict Australian regulatory frameworks.
Severing and extracting legacy infrastructure with absolute statutory compliance
Retiring marine civil infrastructure requires advanced structural engineering and meticulous underwater deconstruction. Combining 100% ADAS-accredited commercial divers, custom-designed hydraulic diamond-wire saws, and heavy-lift crane barges, Commercial Marine Group manages decommissioning projects from RPEQ lift calculations through to baseline seabed clearance audits.
Our Decommissioning Services Include
Statutory compliance. Precise isolation.
SUBSEA COLD-CUTTING & SHEARING
Deploying high-performance diamond-wire saws and heavy hydraulic shears to cleanly sever steel casings, reinforced concrete piles, and pipelines at or below the mudline with zero thermal risk.
STRUCTURAL PILE EXTRACTION
Utilising barge-mounted heavy-lift cranes and specialised vibratory extractors to safely pull steel, concrete, and timber pilings from the seabed substrate without collapsing adjacent structures.
SEABED CLEARANCE & VERIFICATION
Executing precise Multi-Beam Echo Sounder (MBES) surveys and tactile diver sweeps post-deconstruction to certify absolute seabed clearance and map localised bathymetric changes.
PIPELINE & UMBILICAL DE-INVENTORY
Flushing, pigging, and purging subsea chemical and flow lines before underwater severance. Installing robust, certified subsea blind flanges and capping plugs to isolate lines permanently.
ECOLOGICAL TURBIDITY MITIGATION
Installing weighted dual-curtain turbidity barriers and marine-mammal friendly acoustic bubble curtains to isolate acoustic and sediment footprints during concrete pile deconstruction.
ARTIFICIAL REEF CONVERSION
Bespoke engineering of decommissioned steel jacket elements and platform structural panels, preparing and positioning materials for approved artificial marine reef systems.
Marine Deconstruction & Environmental Isolation
Retired marine civil assets require structured, safe isolation. CMG’s decommissioning framework integrates strict environmental barriers, certified cold-cutting metrology, and deep-seabed clearances within a single, highly coordinated operational sequence.
COLD-CUTTING PRECISION
We sever concrete and steel pilings at or below the mudline utilising subsea hydraulic diamond-wire saw arrays, removing explosives barotrauma risk completely.
PARTICULATE & TURBIDITY CURTAINS
Deploying weighted dual-layer geotextile silt curtains around structural removal zones to prevent particulate migration in Moreton Bay and Western Australian ports.
OFFSHORE HEAVY LIFT COORDINATION
Meticulous temporary works, modular barge ballasting, and crane lifting schemes calculated under RPEQ frameworks to protect operational wharves.
Frequently Asked Questions
Technical insights regarding our marine deconstruction, pile extraction, and regulatory approvals.
What subsea cold-cutting methodologies does CMG use to sever marine piles below the mudline?
CMG completely avoids underwater explosives to protect marine mammals and adjacent structures. Instead, our ADAS commercial divers deploy hydraulic diamond-wire saw arrays and heavy-duty mechanical cutting shears. To sever piles at or below the mudline, divers excavate the surrounding seabed utilising hydraulic educators, position the diamond-wire saw clamp, and execute a cold cut. This cuts through steel sleeves, high-strength concrete cores, and internal reinforcement cleanly, leaving a flush, secure seabed outline that satisfies class and statutory port requirements.
How does CMG maintain strict biosecurity and environmental safety during deconstruction?
Marine deconstruction can displace heavy sediment, organic fouling, and localized contaminants. In compliance with Western Australian (DWER) and Queensland (DESI) environmental frameworks, we install dual-layer, weighted marine geotextile silt curtains around the active deconstruction boundary. To prevent the migration of suspended concrete dust during hydraulic breaking, we integrate underwater suction recovery systems. Additionally, we use bio-degradable hydraulic fluids in all subsea tools to eliminate chemical contamination risks in sensitive regions like Cockburn Sound or Moreton Bay.
What are the regulatory approval steps required for subsea infrastructure removal in Australian waters?
Subsea decommissioning in Australian coastal waters is highly regulated. Projects must coordinate approvals with the Australian Maritime Safety Authority (AMSA), State Port Authorities (such as Pilbara Ports or Port of Brisbane), and state environmental protection departments (DWER WA, DESI QLD). CMG’s in-house engineering team drafts comprehensive decommissioning schemes, structural lift calculations, and environmental monitoring plans. Every step is reviewed and signed off by an RPEQ (Registered Professional Engineer of Queensland) or WA equivalent chartered engineer to guarantee statutory and safety compliance.
How does CMG ensure adjacent wharf sections remain stable when removing old marine structures?
Removing heavy wharves or dolphins can alter localised load distribution and soil bearing capacity, threatening the safety of adjacent berths. CMG’s engineers execute rigorous temporary works design and finite element analysis (FEA) to assess pile load-sharing boundaries prior to deconstruction. We integrate continuous real-time tilt, vibration, and strain gauges onto adjacent operational wharves during the extraction process. This allows our project managers to adjust vibratory extraction frequencies and crane lift weights in real time, keeping values well within safe engineering margins.
What is the process for subsea flowline and umbilical de-inventory and capping?
To prevent hydrocarbon or chemical discharge during severance, subsea pipelines and umbilical cables undergo meticulous de-inventory. Our dive teams connect high-volume water-flushing loops to the line terminals, pigging and flushing the internal volume until chemistries confirm zero residual pollutants. Divers then utilize hydraulic shears to cut the isolated line, seal the exposed raw casing using RPEQ-engineered subsea blind flanges, and secure it with dual mechanical locking clamps, providing permanent environmental isolation.