News

More News & Case Studies

Engineering Where Downtime Isn’t an Option

Why Australia’s Marine Infrastructure Demands a Different Engineering Mindset Across Australia’s ports and industrial terminals,

News
Meet the Team | Luis Diaz | Part Two

What’s Next for Technology in Marine Delivery In Part Two of our Meet the Team

Meet The TeamNews

Download Our Capability Statements

Commercial Marine Group at Coasts & Ports 2025

August 21, 2025

2025News

At the PIANC Coasts & Ports 2025 Conference in Adelaide, Commercial Marine Group presented two papers demonstrating how innovation, constructability, and collaboration can provide smarter, low-disruption solutions for Australia’s ports and waterways.

Both papers aim to share practical insights from recent projects, highlighting solutions that extend the lifespan of marine infrastructure and establish new standards in subsea installation and repair techniques.

White Papers Presented:

  • Hamilton Siphon Subsea Pipeline – Constructability tools to optimise subsea installation in congested urban river conditions, delivered within just 6 weeks on site and without disrupting Brisbane Port operations.
  • Jack-Up Pile Solution – A low-impact repair method that extends wharf service life by replacing compromised pile sections from beneath the seabed, successfully implemented at Ampol Wharf without stopping operations.

Both papers showcase our dedication to knowledge-sharing within the marine industry and illustrate how real-world engineering challenges can be addressed through innovative design and collaboration.

Let's Build
Together