Projects

More Projects & Case Studies

Underwater Inspection & Hydrus AUV 3D Mapping | CMG Great Keppel Island

Middle Island Underwater Observatory Inspection Client: DEMEXDate: September 2025 Commercial Marine Group was engaged by

20253D ScanningDEMEXHydrus AUVProjectsUnderwater Inspections
Port North Common User Berth Deconstruction and Removal Works

Client: Brady Marine and Civil | Port of Brisbane Commercial Marine Group was engaged by

Brady Marine & CivilBrisbane PortDecommissioningProjects

Download Our Capability Statements

Port North Pipeline & Products Wharf, Brisbane – Pile remediation

Pile RemediationProjectsUGL Pty Ltd (BP)

Client: UGL Pty Ltd (BP)
Project Dates: 2019 ongoing – into its 6th year, 15 phases of work,
to meet compliance and annual maintenance budgets.

OVERVIEW

  • Live operational site working in around operational pipeline and wharf
  • UGL Pty Ltd have been systematically remediating piles over the pipeline since mid-2019. Piles have been remediated using Pilemedic by Quakewrap – with a mixture of structural and durability.
  • Scope includes concrete breakout, cleaning, airlifting, spacer installation, FRP rod installation (as required) and product installation.
  • 215 piles remediated;
  • Manage this project simultaneously with other projects, with up to four (4) Dive Teams in operation at any one time.
  • Provision of plant such as dive equipment, vessels, barges and pontoons
  • Detailed interim Progress Report delivered to UGL Pty Limited for their Client (ATOM) – link here – please note that this is a confidential report and should only be used to assist in evaluating CMG’s tender.
  • Reporting, including compliance to ITPs

Project Gallery

Let's Build
Together