Port North Common User Berth, Brisbane – Dredging, Install Scour Mats

Client: Brady Marine Asset Owner: Ports North Port North Common User Berth required Fabric Formed grout mattresses to be installed around the intake structure to provide protection against scour. To be able to achieve this, installation dredging operations were required to remove 220m3 of sediment to achieve the required design RL. The grout mattresses specified […]

Fitzroy River Barrage, Rockhampton – Install scour mats

Client: PensarAsset Owner: Sunwater As part of the works, a portion of the existing weir requires to be cut to allow the placement of the fishway exit. At the time of Issuing for Construction, the excavation of the existing embankment at the exit was not considered. It is now understood that to complete the fishway […]

Hamilton Siphon Bypass Pipeline, Brisbane – Install pipeline and scour mats

Client: Fulton HoganAsset Owner: Urban Utilities The Hamilton Siphon Bypass Pipeline C is an subsea pipeline across the Brisbane River for the transfer of sewage. The subsea pipeline design and construction methodology is unique for the specific constraints and limitations of the Brisbane river. Close collaboration enabled the team to deliver the project in 11months […]

Ampol Products Wharf, Brisbane – Install Jack up piles & remove piles

Client: Brady MarineProject Dates: 2023-2024 OVERVIEW The innovative pile jack up repair provides a solution to underwater piles needing an extension of design life. The marine borer erodes the piles at seabed level and far more rapidly than rest of the structure, meaning the useful life of the facility is compromised. The team uses a combination […]